2013年11月18日星期一

HP certification HP5-K03D best exam questions and answers

What are you waiting for? Opportunity knocks but once. You can get HP HP5-K03D complete as long as you enter ITCertKing website. You find the best HP5-K03D exam training materials, with our exam questions and answers, you will pass the exam.

The quality of ITCertKing product is very good and also have the fastest update rate. If you purchase the training materials we provide, you can pass HP certification HP5-K03D exam successfully.

There are many ways to help you prepare for your HP HP5-K03D exam. ITCertKing provide a reliable training tools to help you prepare for your HP HP5-K03D exam certification. The ITCertKing HP HP5-K03D exam materials are including test questions and answers. Our materials are very good sofeware that through the practice test. Our materials will meet all of theIT certifications.

HP HP5-K03D exam certification is widely recognized IT certifications. People around the world prefer HP5-K03D exam certification to make their careers more strengthened and successful. Speaking of HP HP5-K03D exam, ITCertKing HP HP5-K03D exam training materials have been ahead of other sites. Because ITCertKing has a strong IT elite team, they always follow the latest HP HP5-K03D exam training materials, with their professional mind to focus on HP HP5-K03D exam training materials.

Exam Code: HP5-K03D
Exam Name: HP (Delta - Supporting and Servicing HP 3PAR StoreServ Solutions)
One year free update, No help, Full refund!
Total Q&A: 30 Questions and Answers
Last Update: 2013-11-18

ITCertKing is website that can take you access to the road of success. ITCertKing can provide the quickly passing HP certification HP5-K03D exam training materials for you, which enable you to grasp the knowledge of the certification exam within a short period of time, and pass HP certification HP5-K03D exam for only one-time.

HP5-K03D Free Demo Download: http://www.itcertking.com/HP5-K03D_exam.html

NO.1 A customer has three HP 3PAR StoreServ 10000 systems in different sites on their
metropolitan campus The FC-based SANs within the different sites consist of B-series 8 Gbps
switches with an active port-based zoning. Between the sites, there is a 10 Gbps Ethernet
connection.
Which remote copy configuration should you recommend?
A. N-to-1 Configuration
B. Synchronous Long Distance Configuration
C. Unidirectional 1-to-1 Configuration
D. 1-to-N Configuration

NO.2 A customer has an existing c70fJ0 enclosure, with 6 blades and FlexFabric modules. You have
been asked to install 5 additional blades for a virtualization project. The customer requires shared
storage for a Hyper-V cluster.
Their existing storage infrastructure is 1Gb iSCSI.
What would be the most cost-effective method for adding a new 3PAR storage?
A. Directly attach the FC Host ports of the c7000.
B. Install SAN Switch Modules in the c7000.
C. Install two Brocade 8 / 8 SAN Switches
D. Upgrade the network switches to 10GB
Answer: A

HP   HP5-K03D pdf   HP5-K03D   HP5-K03D

NO.3 What must be done prior to running HP 3PAR SmartStart?
A. The service laptop needs to be connected to the StoreServ system.
B. The Service Processor and StoreServ system must be connected to the same subnet
C. An installation service call must be placed with HP Central,
D. A zone must be created between the StoreServ system and the Service Processor.
Answer: B

HP test answers   HP5-K03D test questions   HP5-K03D

NO.4 Your customer has an existing HP 3PAR F400 array with two controller nodes and eight DC3
disk enclosures Each DC3 disk enclosure is fully populated with 300GB 15k disk drives.
The customer has purchased a new HP 3PAR StoreServ 7400 two-node system with five additional
drive enclosures to be installed in a second data center. This system is fully populated with 450GB
10k drives. Data will be migrated from the F400 to the 7400 by using Remote Copy Fibre Channel
(RCFC). The 7400 will then become the primary system, but data will continue to be replicated
between the systems. Additionally, the customer has ordered extra 8GB/S FC adapters for the new
7400.
What is the maximum number of configurable host ports on the new HP StoreServ 7400 array in the
customer environment?
A. 4
B. 8
C. 10
D. 12
Answer: D

HP pdf   HP5-K03D   HP5-K03D   HP5-K03D   HP5-K03D original questions
5. Your customer has an existing HP 3PAR F400 array with two controller nodes and eight DC3
disk enclosures. Each DC3 disk enclosure is fully populated with 300GB 15k disk drives.
The customer has purchased a new HP 3PAR StoreServ 7400 two-node system with five additional
drive enclosures to be installed in a second data center. This system is fully populated with 450GB
10k drives Data will be migrated from the F400 to the 7400 by using Remote Copy Fibre Channel
(RCFC). The 7400 will then become the primary system, but data will continue to be replicated
between the systems. Additionally, the customer has ordered extra 8GB/s FC adapters for the new
7400.
During the installation you record these serial numbers for the new HP 3PAR StoreServ system:
HP serial number CZ32439658
3PAR serial number 1628580
Which SPID is assigned during the installation?
A. SP0001628580
B. SP32439658
C. 1628580
D. 00032439658
Answer: A

HP   HP5-K03D exam   HP5-K03D   HP5-K03D
Reference:http://bizsupport2.austin.hp.com/bc/docs/support/SupportManual/c03603825 /c036038
2 5.pdf(page 7, second bullet)
6. Which statements are true about the HP 3PAR StoreServ 7000? (Select two.)
A. Within a column, there can be empty slots between drives.
B. Columns of drives must be of the same drive type and rotational speed for HDDs.
C. Drives must be added in identical pairs.
D. The LFF enclosure cannot be mixed with the SFF enclosure on the same node pair,
E. All columns have to contain the same number of drives.
Answer: B,C

HP   HP5-K03D braindump   HP5-K03D dumps   HP5-K03D   HP5-K03D exam prep
7. Your customer plans to build a two-tier architecture with one HP 3PAR StoreServ 7400. Layer 1
should be the SSD Tier, and Layer 2 should be the Fast Class Tier. After the SmartStart configuration
is complete, the customer connects to the system through the InformOS Management Console.
Which default CPGs are created during the process of initializing the storage system?
A. SSD RAID 1 and 5: Fast Class 1 and 6 default CPGs
B. SSD RAID 1 and 5: Fast Class 1 and 5 default CPGs
C. SSD RAID 1,5,and 6; Fast Class 1 and 6 default CPGs
D. SSD RAID 1 and 5 FastClass 1,5 and 6 default CPGs
Answer: A

HP exam   HP5-K03D certification training   HP5-K03D   HP5-K03D exam simulations

ITCertKing offer the latest C_TADM51_70 exam material and high-quality 000-087 pdf questions & answers. Our 700-501 VCE testing engine and HP0-S33 study guide can help you pass the real exam. High-quality LOT-927 dumps training materials can 100% guarantee you pass the exam faster and easier. Pass the exam to obtain certification is so simple.

Article Link: http://www.itcertking.com/HP5-K03D_exam.html

没有评论:

发表评论